DATES: April 2011 - November 2011
LOCATION: Irvine, CA
Description
This project required building 2nd deck access ramps to the top of an existing apartment building. Sharma used lightweight Geofoam material to complete the job. The precision required — a perfect fit of Geofoam blocks in between walls – necessitated the onsite use of hot wire cutters. Each foam block was glued in place or secured with GeoGripper Plates.
Challenges
The onsite cutting and the installation of Geo Foam blocks with no gaps were the biggest challenges on this project.